Risk Assessments and Method Statements

Plant Risk Assessments & Method Statements

Free Construction RAMS Templates, Guidance & Practical Resources

Risk Assessments & Method Statements

Whether you’re planning a lifting operation, operating an excavator or preparing for work on a construction site, having suitable Risk Assessments and Method Statements (RAMS) is an important part of safe planning.

Our growing collection of free RAMS templates has been created to help employers, supervisors and contractors produce clear, practical documentation for a range of common plant and construction activities. Each resource is designed as a starting point and should always be reviewed and adapted to reflect your own site, equipment, workforce and working environment.


What Are RAMS?

RAMS stands for Risk Assessments and Method Statements.

A Risk Assessment helps identify hazards, assess the level of risk and record the control measures needed to reduce those risks.

A Method Statement explains how a task will be carried out safely, including the equipment, sequence of work and precautions that should be followed.

Together, they form an important part of planning many construction activities and are commonly requested by principal contractors before work starts.


What’s Included?

Our resource library is continually expanding and will include downloadable templates for a wide range of plant and construction activities, including:

  • Excavator Risk Assessments
  • Telehandler Risk Assessments
  • Dumper Risk Assessments
  • Ride-on Roller Risk Assessments
  • Loading Shovel Risk Assessments
  • Excavator as a Crane RAMS
  • Working Near Underground Services
  • CAT & Genny Activities
  • Plant Maintenance Activities
  • Lifting Operations
  • Generic Construction Method Statements

Each template is designed to be practical, editable and easy to adapt for your own project requirements.


Important Information

Every construction project is different.

These templates are provided as guidance and should not be used without review.

Before work begins, a competent person should ensure that all Risk Assessments and Method Statements are suitable for the specific:

  • Site
  • Task
  • Plant or equipment
  • Ground conditions
  • Workforce
  • Environmental factors
  • Client requirements

Additional control measures may be required depending on the nature of the work being carried out.


Why Choose Vally Plant Training Resources?

At Vally Plant Training, we work with plant operators, supervisors and construction companies every day. The questions we’re asked during training and workplace assessments have helped shape these resources, making them practical, straightforward and relevant to real working environments.

Our aim is to provide documents that support safer planning while encouraging good working practices across the construction industry.

As our Resource Centre grows, we’ll continue adding new templates, inspection forms, toolbox talks and practical guidance covering a wide range of plant and lifting operations.


Related Resources

You may also find these free resources useful:

  • Daily Plant Inspection Checklists
  • Plant Safety Guides
  • Plant Operator Guides
  • Toolbox Talks
  • Plant Defect Report Forms

Disclaimer

The templates available within this section are provided for general guidance only.

They are intended as editable starting points and must be reviewed, amended and approved by a competent person before being used on any project.

Vally Plant Training accepts no responsibility for the use of these documents without appropriate review or modification to suit the specific task, site conditions and applicable legislation.

Excavator Risk Assessment

View our 360 Excavator Risk Assessment with a free download
Excavators

Plant Machinery

Telehandler Risk Assessment Dumper Risk Assessment Ride-on Roller Risk Assessment Loading Shovel Risk Assessment Crusher Risk Assessment
COMING SOON

Lifting Operations

Excavator as a Crane RAMS Lift Plan Guidance Slinger Signaller Method Statement Lift Supervisor RAMS
COMING SOON

General Site Safety

Permit to Dig Template Plant Defect Report Form Daily Plant Inspection Checklist Toolbox Talk
COMING SOON

NVQ Plant Operator Red To Blue Cards

Visit our NVQ page And understand what you need to do to complete the Level 2 Plant Operations Level 2 NVQ

Looking for Practical Plant Training?

Our free downloads are designed to support your learning, but nothing replaces hands-on training delivered by experienced instructors.

Whether you’re an individual operator or arranging training for your workforce, Vally Plant Training offers professional NPORS training at our Tewkesbury training centre or on customer sites throughout the UK.

Contact our team today to discuss your training requirements.

Costs are shown on our training pages for courses held at VPT site only,  prices for on-site training will be different so please contact us for accurate pricing.

The cost for group booking will most probably be cheaper.

Excavator Training can take up to 10 days, at VPT we deliver 1-on-1 360 Excavator Training over 5 days giving the candiadate 100% of the practical time on the machine. We have found this to be the best way to train the candidates and our 5 star Google Reviews shows this.

Yes, we have our training centre in Tewkesbury, Gloucestershire, however our qualified instructors travel throughout the UK to deliver training or testing at our customers sites.

No, we offer complete novice training for candidates with no experience, however some site experience is an advantage but not a necessity.

Both are the same, NPORS and CPCS both carry the CSCS logo and should be accepted on all sites. We only offer the NPORS Training though.

NPORS is more flexible as training and testing can be carried out on customers sites whereas CPCS must be completed at a training centre. Operators who have completed both say that NPORS is more flexible and generally cheaper to achieve your card.

Years in Business
0
Certifications Provided
0 K+
On Site Courses
0 +
Google Reviews
0 +
Scroll to Top